Real Colorado projects, start to finish. From steep erosion control in Boulder to native seeding at a mountain ski resort, and new and restored lawns all over Colorado, here is what hydroseeding with SeedSprayers actually looks like on the ground.
A mite-damaged lawn was restored in 7 weeks with SeedSprayers Hydroseeding
Service: Lawn Restoration · Location: Colorado
Week 0
The starting point
Before Hydroseeding, severe mite damage.
Week 1
Right after installation
Freshly hydroseeded lawn, after power ranking service.
Week 7
The result
Uniform colorado lush, green grass coverage, deep root establishment.
Zombie Grass Lawn Restoration — Berthoud
A Berthoud homeowner called SeedSprayers about a lawn that had gone patchy and dead with no obvious cause. Grubs and mites had eaten the roots out from underneath it, leaving grass you could pull straight out of the ground with your fingers. SeedSprayers power raked out the dead material, hauled away the spoil, cut the remaining grass low for good mulch contact, and sprayed the whole lawn. With consistent watering, the lawn filled back in over about seven weeks.
Patchy grass was made lush in 5 weeks with SeedSprayers Hydroseeding
Service: Lawn Restoration · Location: Colorado
Week 0
The starting point
Patchy grass. Used power ranking lawn service.
Week 1
Right after installation
Freshly Hydroseeded Lawn.
Week 7
The result
Lush, beautiful grass.
Patchy Lawn Revival — Colorado
This lawn had the two problems that account for most patchy grass in Colorado: bug damage that killed sections outright, and sprinkler zones that never got full coverage. A hot summer with water restrictions turned those thin spots into bare dirt. SeedSprayers raked out the dead material, added compost and organic matter, and overseeded the affected areas while the sprinkler coverage was corrected. About five weeks later the lawn was even and filled in.
Boulder Hillside Hydroseeded: Erosion Control for a Fast Certificate of Occupancy
Service: Erosion Control · Location: Boulder, CO
Before
The starting point
Freshly graded Boulder hillside with bare topsoil, steep and at risk of washing out.
After
The result
Stabilized, green slope about six weeks after erosion-control hydroseeding.
Boulder Hillside Hydroseeding for a Fast Certificate of Occupancy
A new senior living development in Boulder was operating on a temporary certificate of occupancy with residents already moved in. The city required the hillside revegetated before it would issue the full CO, and the deadline was September with work starting at the end of July. On SeedSprayers' recommendation the hillside was terra-seeded with soil and seed, then SeedSprayers sprayed a heavy-duty mulch over the entire slope so nothing washed off before it could root. Afternoon rainstorms and steady watering did the rest, and the hillside had the growth Boulder needed in about five weeks.
Denver Church Grounds: Hydroseeded 1.2 Acres of Turf in a Single Day
Service: Large / Commercial Turf · Location: Denver (Hampden & I-25), CO
Before
The starting point
Prepped 1.2-acre church lot awaiting turf establishment.
After
The result
Full, uniform green turf across the church grounds.
This church near Hampden and I-25 was left hanging when its original hydroseeding contractor stopped returning calls, even though the site was prepped and ready. The City and County of Denver required 1.2 acres of turf. SeedSprayers stepped in at a competitive price and sprayed the entire 1.2 acres in a single day. With watering, the grass came in across the whole property.
Bare, prepped residential yard in Parker, ready for seeding.
After
The result
Established green turf lawn after full-service hydroseeding.
A large residential property in Parker hired SeedSprayers for the full job: prep, install, and everything in between. After prepping the ground, the team sprayed a turf-grass blend across the yard, and it came in clean and even.
School of Mines Fraternity House: Hydroseed Turf-Grass Install in Golden
Service: Institutional Turf · Location: Golden, CO
Before
The starting point
Prepped fraternity house yard with new sprinklers, ready for grass.
After
The result
Green turf hydroseeded lawn at the School of Mines fraternity house.
A fraternity house at the Colorado School of Mines handled its own prep and sprinkler install, then brought in SeedSprayers to hydroseed the grass. The team sprayed a turf-grass blend, and the lawn established well.
Eldora Mountain Resort: Native Seeding at a New Lift
Service: Native Seeding · Location: Eldora, CO
Before
The starting point
Freshly graded ground around Eldora's new lift base.
After
The result
Native grasses established about two years after seeding at Eldora.
When Eldora Mountain Resort built a new lift and base area, the crew handled soil prep and brought in SeedSprayers to hydroseed their own specified native seed mix across the disturbed ground. The after photo, taken about two years later during follow-up work at the resort, shows native grasses established high on the mountain.
Real Photos - SeedSprayers Colorado Hydroseeding Gallery
A scrolling look at more SeedSprayers work across Colorado: turf lawns, native and pasture seeding, erosion control, and large commercial sites from the Front Range to the mountains.